Page 22 - JSW_Bolt_Cover
P. 22

resolved?
                                                                                                                               In-House Generator Stator Chemical
                                                                                                                               Cleaning by introducing Nitrogen (N2)
                                                                                                                                                                                       The entire team had felt extremely happy
                                                                                                                               bubbling arrangement in SCW tank to
                                                                                                                                                                                       as the problem was solved in-house
                                                                                                                                                                                       without disturbed the stator coil system.
                                                                                                                               reduce Dissolved Oxygen in stator water.
                                                                                                                                                                                       Management had given positive response
                                                                                                                               This Chemical cleaning was process was
                                                                                                                               including selection of cleaning chemical,
                                                                                                                                                                                       & supported in all aspects to achieve the
                                                                                                                               circulation pump, corrosion inhibitors,
                                                                                                                                                                                       results.
                                                                                                                               online monitoring of chemical & process
                                                                                                                                                                                       Any specific aspects which you may like
                                                                                                                               parameters, balancing of N2 pressure &
                                                                                                                                                                                       to mention?
                                                                                                                               DO in stator water system. In this process
                                                                                                                               injection of chemical solution was
                                                                                                                                                                                       Management supported well and they
                                                                                                                                                                                       believed in our team to carry out such a
                                                                                                                               continuously done for nearly 72 hrs. at
                                                                                                                                                                                       critical activity without. After seeing the
                                                                                                                               inlet of stator coil, in parallel with removal
                                                                                                                               of contaminants (copper oxides) at outlet
                                                                                                                                                                                       results, the same activity was repeated in
                                                                                                                               by using Mixed Bed (MB) in SCW system.
                                                                                                                                                                                       Jaigarh plant also.
                                                                                                                               High pure Nitrogen (N2) was used for
                                                                                                                               blanketing to reduce the DO in stator
                                                                                                                               water system.  The overall activity was
                                                                                                                               carried out in coordination with
                                                                                                                               Chemistry, Operation and Maintenance
                                                                                                                               dept.  Total Cost incurred for the said
                                                                                                                               activity was Rs. 5000/-.
                                                                                                                               Impact of solution to the
                                                                                                                               business?
                                                                                                                                This had saved cost of generator
                                                                identified?
                                                                                                                               stator coils and cost of cleaning
                                                                Increasing trend in 300 MW Generator
                                                                                                                               by OEM is around Rupees 120
                                                                stator coil differential pressure indicating
                                                                                                                               Lacs/Unit. And Generator
                                                                the flow restrictions within the stator
                                                                                                                               performance was improvement a
                                                                cooling water channels. Observed there
                                                                                                                               lot. Generator stator DP reduced
                                                                was continuous increasing trend in Stator
                                                                                                                               from 0.23 to 0.15 Mpa, stator
                                                                coil dP from 0.15 to 0.23 Mpa and
                                                                                                                               water flow improved from 46 to 55
                                                                reduction in stator water flow from
                                                                                                                               TPH.
                                                                55 to 46 TPH.
        INNOVATION                                              How and Why was the problem                                    How was the problem solved?                             How the team felt on the problem being
                                                                                                                                                                                                            JSW ENERGY BOLT  |  ISSUE 1
                                                                                                                               Installation Of VFD In CEP, ID Fan; Auto Mode Of Coal Mill
                                        JSWEL, Ratnagiri                                                                       Sealing Air System; Header Pressure Reduction in PA Fan;
                                                                                                                               Operational Improvement in Sea Water System, ACW System,
        Replacement Of APH Basket                                                                                              Milling System, LDO Transfer System
        How and Why was the                                     By reducing the auxiliary power in ESP                         How and Why was the                                     Recognition of the team by the top
        problem identified?                                     System, Cost saving of 4 Crore per                             problem identified?                                     management (at plant level and at
                                                                year achieved.
        QIP team name reduction of defects in                                                                                  Problem - Lower PLF and no schedule                     corporate level) felt   the team motivated
        ESP system, as a part of QIP team we                    How the team felt on the problem                               from MSEDCL /DAM/TAM resulting the                      and enthusiastic.
        have started identifying the defects and                 being resolved?                                               Auxiliary Power    Consumption (APC) %                  Any specific aspects which you may like
        root cause analysis carried out for the                 Team are feeling very happy and defects                        on higher side.                                         to mention?
        defects. Most of the defects are arises                 are reduced drastically due to running
        due to running hours of equipment's so                  hours optimization.                                            How was the problem solved?                              The journey continued to improve the
        we have started optimize the ESP                                                                                       Installation of VFD in CEP and reducing                 plant performance and make our plant the
        parameters after studying the ESP                       Any specific aspects which you may like                        the pressure set point of the CEP from                  best in all aspect so that our plant will be
        documents and gathering the knowledge                   to mention?                                                    2.7 MPa to 1.9 MPa.                                     the benchmark to others. Rather than
        from ESP training given by BHEL                         Received an award for this innovative idea                                                                             individual, team work always give the
        representative. We have conducted                       implemented in ESP System.                                     Installation of VFD in ID fan and                       best result.
        testing after changing the ESP                                                                                         replacement of hydraulic coupling
        parameters and ensured                                            Team Members                                         with spacer shaft.                                                Team Members
        system improvements.                                                                                                   IFC installation and reduction in service                  Mr. Vijay Likhitkar
                                                                   Mr. Ganesh Kumar R
        How was the problem solved?                                                                                            air set point from 6.5 KSC to 5.5 KSC.                     Mr. Chinmay Thakur
                                                                   Mr. Anand Vaidya                                                                                                       Mr. Vikas Jagdale
        By changing ESP Fields charging ratio and                  Mr. Ajay Patil                                              Replacement of APH basket and reduction                    Mr. Samir Talekar
        running time optimization of ERM CRM                       Mr. Rajesh Padhy                                            of DP across APH from 2.13 KPa to                          Mr. Avadhut Kelkar
        motors and hopper heaters.                                                                                             0.85 KPa.
        What were the challenges                                                                                               What were the challenges
        encountered?                                                                                                           encountered?
        After changing the ESP                                                                                                 Equipment stability with variation of
        parameters found difficulties in                                                                                       load is one of the challenges.
        taking samples from chimney                                                                                            Impact of solution to the business?
        during testing.
                                                                                                                               Reduction in APC from 9.07 % to 8.9%.
        Impact of solution to the

        business?                                                                                                              How the team felt on the problem
                                                                                                                               being resolved?


    18                                                                                                                                                                                                                                    19
   17   18   19   20   21   22   23   24   25   26   27