INNOVATION                                                                                                                                                                                          JSW ENERGY BOLT  |  ISSUE 1

        same. Some of the major areas identified                drastically which resulted in reduction of

        were Fan Power Consumption, LHS Power,                  Auxiliary Power consumption by 12.8 MW                                                      JSWEL, Vijayanagar
        ESP Power, LT drive’s, Compressor                       (1.18%).  It resulted in increase in EBIDTA

        Running Hr.                                             by Rs. 18.72 Cr. /yr.                                          Optimization Of AHP & ESP Aux Power (300 Mw)
        A major chunk of excess power
                                                                How the team felt on the problem being
        consumption was seen in Fan Power.                      resolved?
        After further study & analysis it was                                                                                  How and Why was the                 avoid ash solidification.           hours were studied in detail

        observed that the APH tubes were                        It gave the Team immense pleasure on                           problem identified?                 These heaters are controlled  and the decision was taken
        prematurely. The normal schedule for                    overcoming the problem & indulging                             Ash Handling Plant (AHP)            with primary sensors                to stop the compressors for

        replacement of APH tube was triennial.                  confidence to tackle such problems.                            and ESP was identified for          installed at last row of ESP        6 hours in a day without
        Since the tubes were failing prematurely,               Any specific aspects which you may like                        power consumption                   hoppers. Since temperature          affecting ash conveying

        we started to inspect tube leakages in                  to mention?                                                    optimisation as both the            of last row normally remains  cycles and also ensuring
        side APH during opportunity and plug                                                                                   areas had good potential for        low, all the heaters used to        hoppers are evacuated.
                                                                Also, we would like to extend our                                                                  be ON along with last row
        them. But this practice was also not                                                                                   energy savings. Continuous                                              ESP : Since last row sensors
                                                                Gratitude to the Top Management at                                                                 which resulted in high
        sustainable as tubes were losing the                                                                                   monitoring and analysis on                                              were used for controlling all
                                                                RWPL for extending their support both                                                              power consumption.
        strength due to corrosion, the fan power                                                                               power consumption pattern                                               hopper heaters, it was
                                                                technically as well as financially from                                                            Apart from that, the modes
        consumption was reducing initially but                                                                                 revealed significant energy                                             decided to install additional
                                                                Idea Initiation till project execution.                                                            of ESP fields operation set
        was increasing again over a period. As                                                                                 saving option in ash                                                    sensors at every alternate
        Plugging was a temporary solution and                                                                                  conveying air compressors           were to keep the fields in          hopper to have fine control

        was not lasting for longer period.                                Team Members                                         and ESP fields and                  continuous charged                  on heaters. Further to
                                                                                                                                                                   condition, which does not
        How was the problem solved?                                                                                            Hopper heaters.                                                         reduce ESP power
                                                                   Manoj Kumar Roy                                                                                 require for the ash being           consumption, Field mode of

        It was decided to replace the Tube bundle                  C.V.R. Reddy                                                Ash Handling Plant :  As the        generated in the                    operation was changed

        of APH Biennially with higher thickness of                 Jevesh Srivastava                                           ash conveying system is             present scenario.                   along with duty ratio to have
        tubes. But the time duration for                           Mustakhusen Malek                                           designed to operate at              How was the problem                 intermittent charging
        replacement was a major challenge.                         Atul Joshi                                                  dense phase mode, it was            solved?                             against continuous

        Initially it took 25 days for replacement of                                                                           observed that operating                                                 charging in earlier mode.

        APH tubes. It was not acceptable to                                                                                    cycles were run with lean           AHP : Ash handling
        management for keeping Unit out of Bar                                                                                 phase mode, which in turn           compressors operation
        for long duration. So,another challenge                                                                                was consuming compressor

        was to reduce the tube replacement time.                                                                               power more than  the

        So, after optimization of the tube                                                                                     required.
        replacement activities, it got reduced and                                                                             Electrostatic precipitator
        now we can replace APH tubes in 15 days.                                                                               (ESP) :  Hoppers which


        Impact of solution to the business?                                                                                    collect ash is provided with
                                                                                                                               electric heaters for keeping
        After APH tube replacement, the fan
                                                                                                                               hoppers in hot condition
        power consumption got reduced
                                                                                                                               and ash in fluidising state to

    14                                                                                                                                                                                                                                    15