Page 20 - Cover options
P. 20
INNOVATION
Impact of solution to the business? 4. Overall APC at 150 MW reduced from
8.25% to 6.95% for the first time
1. Savings in CCW pump is 165KWh
since inception
resulted in 19.49 lakhs
2. Savings in CEP is 255KWh resulted in Team Members
41.10 lakhs Mr. Sampath Kulkarni
3. Savings in CHP is 46KWh resulted in Mr. Nataraj Matam
5.25 lakhs Mr. Shradesh Sharma
Mr. Ramneet Singh
16

